Resin patio cost in Hornchurch and Upminster: prices per m² and for a typical back garden

Published 15 October 2026 by Hornchurch & Upminster Driveways

A resin bound patio in Hornchurch or Upminster costs roughly £80 to £120 per square metre once it is laid, which puts a 25 square metre terrace behind a semi at £2,000 to £3,000. That assumes a fairly ordinary job. Gardens round here are rarely ordinary underneath. Havering sits on London Clay, which is slow to drain and moves with the seasons. Thousands of the houses were put up in the 1930s with a narrow passage down the side, or no side access at all. And plenty of old patios were laid with no fall, so the rain has been running back towards the kitchen door for decades. This guide goes through what the money pays for, what pushes a quote up or down, and how resin compares with porcelain and sandstone slabs on the same plot.

What a resin patio costs per square metre

The rate we work to for resin bound surfaces is £80 to £120 per square metre, and that is the same band we use for drives. A patio does not need as deep a base as a drive, because nobody parks on it, but it often costs just as much per metre because it is smaller and harder to reach. The fixed parts of any resin job are a skip, the mixer, two or three people on the day of the pour and a full day of curing. A 15 square metre patio has those costs spread over 15 metres, not 50.

Wide buff resin bound surface running along a brick house past bi-fold doors, with a pale paved strip against the wall

What that rate covers, if the quote is honest:

If you are still deciding between resin and paving for the garden, our patios page covers the slab side of things, and the resin driveways page explains the base build-up we use under every resin surface, whether it’s a drive or a patio.

What a typical back garden comes to

Much of the housing here is interwar semis and terraces, and Elm Park is the clearest example. Costain started building the Elm Park Garden City estate in 1933, and the District line station opened in 1935, so the gardens there are long and narrow and the house at the top usually has a back door or a pair of French doors opening straight onto the garden. A terrace across the width of one of those gardens, running about 4 metres out from the house, is somewhere around 25 square metres.

Aerial view of an interwar suburb with rows of semi-detached houses and long rear gardens behind them

Worked through at our guide rate:

Emerson Park gardens are a different kind of job. The plots are big and often run to a lawn some way from the house, so people ask for a path to a summer house or a garden room at the bottom alongside the terrace. Paths and patios can be poured in the same visit, which saves on mobilising twice.

Lifting the old patio and digging into clay

Before any resin goes down, whatever is there has to come up. Old concrete slabs on a sand bed lift quickly. Crazy paving set in mortar on a concrete raft is slower and heavier, and it can fill a skip on its own. A lawn is the cheapest thing to start from, as long as the turf and topsoil go off site and are not left under the base.

Narrow trench dug through firm brown clay subsoil, with smooth cut sides

Then there is the clay. North of the railway, through Emerson Park and towards Cranham, the subsoil is London Clay, and the British Geological Survey’s research on clay shrink-swell found that the London Clay gets more plastic from west to east, which leaves Havering near the wrong end. That plasticity is what makes it swell in a wet winter and crack open in a dry August. Under a patio we lay a geotextile membrane on the clay, so the stone stays separate from it, and compact the Type 1 in layers. For foot traffic around 100mm of compacted stone is usually right, against the 200mm we put under a drive. On the sandier ground south of the railway towards Elm Park the dig is often quicker and drier, and the price comes out lower.

Getting everything through the side passage

Access is the cost people least expect. A detached house with a wide side gate means a mini digger can drive straight to the back garden. A 1930s semi usually has a passage about the width of a wheelbarrow, often with a gas meter or a bin store halfway down it. A mid-terrace has nothing at all, so every bag in and every bucket of spoil out goes through the hallway on boards.

Green wheelbarrow standing on a narrow garden path between shrubs and a tree

Resin makes this harder. Once the resin and stone are mixed, the batch only stays workable for a limited time, so a long barrow run from the mixer at the front to the back garden needs extra hands to keep the trowelling continuous. On a terrace with no side access we sometimes set the mixer up in the back garden and carry the dry materials through. Either way it is more labour, and it is why a 25 square metre patio behind a mid-terrace can cost more than the same area behind a detached house. A good quote prices it in at the start, not on the final invoice.

Edging, beds and the shape of the garden

Resin is trowelled against an edge, so every border, bed and lawn line needs something firm for the trowel to run against. A straight aluminium trim is the cheapest option and almost invisible. Brick or block laid on edge in concrete costs more per metre but looks right next to the red and brown brick that most houses here are built from. Cranham even had its own brickworks once, the Cranham Brick and Tile Company, which ran from 1900 to 1920. A reclaimed or matched brick edge gives a new patio the same warm colour as the walls around it.

Gravel garden in front of an old brick wall with a planted border and a timber greenhouse

The more shape you add, the more edging there is per square metre of resin. A plain rectangle off the back of the house has edging on three sides. A curved terrace that wraps around two raised beds and a tree might have twice the length of edge for the same floor area. Raised beds built in brick are a separate line on the quote again. None of that is a reason to avoid curves, which resin handles far better than slabs because there are no cuts. Just expect the shape to show up in the price.

Drainage, and the step at the back door

Resin bound is porous, which helps a lot, but the water still has to go somewhere once it is through. On clay that is not going to be straight into the ground. We build the binder and stone so the water can move sideways to a soakaway crate or a gully, and we give the patio a gentle fall away from the house anyway, so heavy rain that sits on the surface runs the right way. If you want to see whether your street sits in a surface water risk area, the government’s long-term flood risk checker maps it by postcode.

Round drain cover sitting in a rainwater puddle on wet brick paving

The back door is where patio jobs most often go wrong. Approved Document C of the Building Regulations sets the damp-proof course at least 150mm above the adjoining ground, and a patio laid tight up to the sill can bridge it and let damp into the wall. Plenty of the old slab patios we lift were built up over the years until they sat level with the airbricks. If your back door has a decent step down, the new patio can simply go back at the right level. If you want a level threshold to new bi-folds, we put a slotted channel drain across the doorway so the water has somewhere to go before it reaches the frame. A channel adds cost, but a lot less than drying out a damp kitchen wall.

Resin or porcelain and sandstone slabs?

On price per metre, resin and slabs overlap. Our slab patios run from about £90 per square metre in Indian sandstone to £150 in a premium large-format porcelain, laid on a full mortar bed with resin-pointed joints, so a 25 square metre terrace in slabs is typically £2,300 to £3,800. Resin at £80 to £120 sits a little under that. The bigger difference is in how they behave.

Tiled rear patio under a covered pergola outside sliding glass doors of a brick house, with wicker chairs

Resin has no joints, so no weeds or moss come through the surface, and it drains through itself, which takes some pressure off the drainage on clay. It follows curves without cutting. It has downsides too. Grease from a barbecue or oil from a garden machine can mark resin in a way that porcelain simply shrugs off. Resin cannot be laid in rain or in the cold, so the job is more weather-dependent. Porcelain also gives you a crisper, more architectural look, which suits modern extensions with large glass doors. Sandstone has the varied, riven face that suits an older house but needs sealing every couple of years. Some people do both: porcelain for the dining area next to the house and a resin path running down the garden.

How long it takes, and getting a quote

A 25 square metre resin patio on a semi with reasonable side access usually takes three to four working days. The first day or two goes on lifting and digging, the next on base, edging and binder, and the resin goes down in one continuous pour on the last day. You can walk on it after about 24 hours. Add a day for a long drainage run, a brick-edged bed or a garden with no side access. And because resin will not go down in rain, onto a damp binder or below 5°C, the start date in a wet October is less fixed than it would be in June.

Rain falling on a garden table and chairs in a walled courtyard, shown in black and white

When you ask for prices, ask each firm to put the same things in writing: the area in square metres, what is being lifted and where it is going, the depth of the base, whether there is a binder layer, the edging, the drainage and the threshold detail at the back door. A quote that just says “resin patio, 25m²” with one number at the bottom leaves out exactly the parts that decide whether it is still flat and dry in ten years. If the old patio sits on clay and the plan is to keep the existing levels, ask how the drainage will work, and read our guide on driveway drainage on Havering’s London clay, because the same ground causes the same problems at the back of the house.

We come out, dig a trial hole, measure the garden and put each of those lines on paper. Get a free resin patio quote in Hornchurch or Upminster.

Questions on this topic

How much does a resin patio cost per square metre in Hornchurch and Upminster?

Our guide range is £80 to £120 per square metre installed, which covers lifting what is there now, the dig, a compacted stone base, an open-graded binder, edging and the resin layer itself. A small or awkward garden sits at the top of that range because the fixed costs are spread over fewer metres.

Can resin be laid straight over my old patio slabs?

Not over slabs. Each slab moves on its own, and the joints between them show through the resin within a winter or two. A sound, uncracked concrete base can sometimes be kept and overlaid, but we dig a trial hole on the visit before saying so.

Do I need planning permission for a resin patio in my back garden in Havering?

Almost never. The 2008 rule on permeable surfaces applies to front gardens, so a rear patio does not need an application to Havering Council. Listed buildings, and patios that raise the ground level a long way next to a boundary, are the exceptions worth checking.

How soon can we use a new resin patio?

You can walk on it after about 24 hours. We would leave heavy furniture, the barbecue and the hot tub off it for a couple of days longer, especially in cooler weather, when the resin takes longer to cure fully.