Start with drainage, because in Elm Park that's where a cheap patio lets you down. Ask any installer where the water from your new terrace is going to end up. If the answer is a vague wave towards the lawn, or worse, towards the house, keep looking. A decent firm will talk about the fall, mention a soakaway or channel if your garden needs one, and put it in writing so it doesn't quietly vanish when the job runs late.
Next, ask how they plan to deal with the old concrete. Lots of Elm Park houses still have the slab or path that went in when the estate was new, or a later one laid over it. Some installers will happily stick new paving on top to save a day. That raises the level towards your damp course and traps water between the layers. Breaking it out is messier, but it's the only way to know what the new patio is really sitting on.
Finally, read the quote properly. It should name the slab and its thickness, for example 20 mm porcelain or 22 mm calibrated Indian sandstone, along with the depth of Type 1, the jointing material and how long the job will take. A 25 m² terrace without steps or walls is three to four working days. If someone promises it in one, ask them politely what they're planning to leave out.