Ask how deep they intend to dig. If the answer is vague, or the quote never mentions a base at all, you are probably looking at slabs on sand. On Harold Wood clay that usually means a wobbly terrace and puddles against the back wall by the second winter. A firm that has thought about your garden will give you a number in millimetres and will happily write it on the quote.
Watch what they do on the visit. Someone who glances at the garden from the patio doors and emails a price per square metre has not checked the levels against your damp-proof course. The finished patio must sit at least 150 mm below it, and on older Victorian houses near the station the DPC can be surprisingly low, which changes how far down the dig has to start.
Find out how they handle access before the day. A Harold Wood terrace without a side gate means tonnes of spoil going out through your hallway and new stone coming back in. Ask about dust sheets, skip placement on the road and how many days that adds. A sensible installer builds the barrowing time into the price instead of discovering it on the morning and charging extra.